Rehabilitation of Access and Parking Facilities at the Siegfried Industrial Site

Saint Vulbas, France

|

2016

VRD Infrastructure

Project

To improve the internal traffic flow within the site and enhance access control and security, the company SIEGFRIED is considering reconfiguring site traffic and centralizing it before security checks.


Scope of Reflection

7 ha


our missions

Preliminary investigations

Technical feasibility studies and cost estimation for the reorganization of access:

  • Creation of a new single access point incorporating a reception area and access control.
  • Adjustment of the location of the parking area for personal and visitor vehicles.
  • Establishment of a storage area for heavy-duty vehicles.

Designer

G.L.I Groupe EKIUM


Client

Société SIEGFRIED