Industrial building construction

Kenitra , Morocco

|

2016 – 2017

VRD Infrastructure

Project

On behalf of the Gergonne Group (an automotive equipment manufacturer), GBI Morocco completed the design and construction of an industrial building spanning 4,500 square meters, with the potential for expansion to 7,500 square meters. B4 Design & Engineering supported GBI by conducting the site design studies (VRD).


Scope of Reflection

4,500 square meters, expandable to 7,500 square meters (new building construction), Site Design (VRD) for the new building.


our missions

AVP | Preliminary Design

EXE | Execution studies

PRODevelopment Design

Project management for Site Design (VRD) and execution file for this Design-Build project.

Studies were conducted with a BIM (Building Information Modeling) approach.


Designer

GBI Morocco


Client

Groupe Gergonne 


©GBI